PROJECT

Overview

PROJECT CAPACITY:

468 MW

TURBINE:

104 locations utilizing Vestas V163-4.5MW™ turbine technology

SUBSTATION:

The project substation will be located off County Highway E 1300 North Road

COLLECTION:

34.5 kV collector system accompanied with fiber optic cabling

INTERCONNECTION:

Project will be interconnected to the grid through the existing ComEd Mole Creek substation

SITE LOCATION:

Stay updated on the Panther Grove 2 Wind Energy Facility